Friday, May 13, 2016

Daily Post: 05/13/16

Hello, I am LM and I will be doing the post for today!

TH and MK kept working on drilling pipes, and effectively assembled the structure that will ultimately host all of the parts for the ROV. They had to be very careful when drilling each of the holes, in order for the body of the machine to be stable and symmetrical.




I (LM), on the other hand, finished the waxing of the three motors. SInce I had been absent for one period, I came in during tutorial and got ahead with the waxing process, so it took me only 10 minutes of today's class to finish that up. The next step was to instal the propellors ion each of the motors, and that was a slow process but pretty simple.
Finally, LL kept working on soldering each of the elements of the control board to it, which is an extremely important step since everything will be managed from there. 

It was a very productive day! Let's hope that by next class our ROV looks like a single, robust machine, and not just a bunch of pieces separated. :)
LM

No comments:

Post a Comment